
Mercury Theatre
More than £500,000 of funding has been used to transform the facilities at the theatre over the summer. Work has included improving the temperature in the studio and main theatre by installing a fully integrated Building Energy Management System (BEMS). An air heating and cooling system has been installed in the studio and theatre, providing […]