Sudbury Health Centre
For this project, new control panels have been successfully designed, manufactured and tested by our engineers and then successfully installed by our qualified electricians. This ensures that there is more control over energy usage so that future savings can be made.
Project Value: £146,000
Project Duration: 9 Months
Project Completed: December 2014